Attachment is MY FRIEND SAMPLE FROM LAST SEMSTER Your assignment is to prepare a mock fee proposal based on the following information: An owner of a 3 acre parcel of land has contacted your firm to provide a fee proposal to design a 25,000 square foot, 6-story office building (structure only) and all associated site work (grading, drainage, parking, civil utilities, etc….site electrical design is not required). The surface parking area will accommodate parking for 250 vehicles. Storm water retention on site will be required and an existing sanitary main runs adjacent to the site. Include the following in your proposal:-Scope of Work to be performed by your firm. (Note: The scope should be full design to meet the Owner’s requirements including structural and site design. Your firm will also provide geotechnical work, surveying, and a Phase I environmental survey) No architectural, mechanical, electrical, or any other design will be required. The owner will be contracting for this work separately. -Estimated Lump Sum Fee to complete the design ready for bidding. (Note: This will require you to estimate the number of hours for each labor classification to complete the design). Likely labor items will include: Senior Engineer, Civil Engineer, Structural Engineer, Draftsman, Clerical, Surveyor, etc. Geotechnical work should include the cost of the drill rig. Provide backup for the lump sum total. In other words, show the number of hours, unit cost and total cost for each labor classification line item. -A unit price listing of hourly rates for various positions in your firm. (Note: These rates will be used to negotiate any additional work should changes arise during design) Be sure to use a fully marked-up rate for each classification to cover overhead expenses for your firm. Please contact me if you have any question
assignment_1.doc
Unformatted Attachment Preview
Project fee proposal
Martín Aguirre
Construction Engineering CE 410-501
Assignment #1
Project objective: To design the structure of a 25,000 square foot, 5-story office building
on a 2 acre parcel. The design will include a drainage system, a proper grading for the
foundation of the structure, a parking lot for 200 vehicles and storm water retention.
Deliverables:
? 25000 square foot, 5-story office building.
? Parking lot with occupancy of 200 vehicles.
? Environmental inspection of the site.
? Drainage system and storm water retention for flood prevention.
? Geotechnical engineering study of the foundation.
? Level grading of the foundation for proper surface runoff.
Cost estimates
This project?s duration is estimated to be 42 weeks, in which the design personnel will put
together a project ready for bidding.
Position
Hourly rate
Project Manager
$ 150
Construction Representative
$ 85
Senior Civil. Eng.
$ 150
Civil Engineer
$ 100
Survey Manager
$ 110
Land Surveyor
$ 150
Cadd Designer
$ 85
Clerical
$ 70
Geotechnical Engineer
$ 120
Drill rig
$ 95
Environmental Engineer
$ 130
1-Man Environmental Crew
$ 115
Hours of work per
week
40
40
8
40
40
40
40
40
40
40
40
40
Work time in weeks Charges
42
$ 252.000
42
$ 142.800
42
$ 50.400
42
$ 168.000
1
$ 4.400
1
$ 6.000
42
$ 142.800
42
$ 117.600
2
$ 9.600
2
$ 7.600
2
$ 10.400
2
$ 9.200
Lump Sum Fee
$ 920.800
Overestimate
$ 1.000.000
…
Purchase answer to see full
attachment
Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.
You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.
Read moreEach paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.
Read moreThanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.
Read moreYour email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.
Read moreBy sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.
Read more