Now you are completing Part 5 of the AAP (WWTC) which is:
“This section will lay out the implementation plan of the entire AAP design, which include configuration of key
networking devices, detailing milestones, activities, resources, and budgets, as well as providing a deliverables
schedule.”
Project Implementation Plan
In this lecture I will discuss implementation plan through an example of an enterprise network.
The figure presents a fictitious enterprise factious network. The company would like to implement a scalable
solution with a routing protocol that provides fast convergence. For optimal routing and packet forwarding,
hierarchical addressing with summarization is required. Users require high­speed access to the server farm with
redundant connectivity for protection. The company has many remote offices; a redundant connection to the
Internet is required to provide the remote offices with nonstop access to its server farm. For remote offices, a
secure connection must be implemented to prevent unauthorized persons from accessing data.
The first step before creating an implementation plan is to gather existing information about the networks and all
the requirements.
The existing topology provides redundant connectivity among all the network devices. Internet connectivity is
dual homed, which provides redundant access to the remote sites as well as World Wide Web resources. The
equipment can provide all the functionalities that are required, but the software version of the operation system
must be upgraded.
The networking equipment has existing IP addressing that needs to be changed to ensure optimal routing and
forwarding of packets as well as summarization. Requirements for server farm access and remote office
connectivity do not include changes in QoS configuration. The server farm hosts the critical applications of the
company including VoIP, and these require preferred treatment. OSPF is configured in the network. This
configuration must be changed, because a faster convergence time is required. EIGRP is better choice than
OSPF.
Security configuration is required to provide secure access to terminal resources. In this case existing security is
sufficient, therefor no changes are needed.
For this scenario implementation plan would be
Project contact list
Location information and means of accessing the premises
Tools and resources
Assumption
Task and detailed description
Network staging plan
Project Contact List
Consultant Project Team
Customer Project Team
Project Manager
Project Manager
Telephone
Telephone
E­Mail
E­Mail
Configuration Engineer
Configuration Engineer
Telephone
Telephone
E­mail
E­mail
Project Coordinator
Project Coordinator
Telephone
Telephone
E­mail
E­mail
Equipment installation Plan
Location
Floor
Room
Rack Number
Tools Required
Details
Item Number
Item
1
PC with a VT 100 emulator, 10Base­T interface, FTP Server,
TFTP client application
2
Console port cable DB9­RJ45/DB25
3
10Base­T Ethernet cable
The implementation task list must provide a breakdown of the implementation process, followed by a detailed
description of each activity.
Implementation Tasks
Step Number
Task
Connect to the router
Verify the current installation, create a backup file
(Note: this is not applicable in WWTC)
Change the Cisco IOS software version on all devices
(Note: this is not applicable in WWTC)
Update or configure the IP address configuration on distribution routers.
Configure EIGRP (see detail below)
Router>en
Router#config t
Enter configuration commands, one per line. End with CNTL/Z.
Router(config)#host Router1
Router1(config)#router eigrp 1
Router1(config­router)#network 10.1.112.0 0.0.0.255
Router1(config­router)#network 10.1.115.0 0.0.0.255
Router1(config­router)#no auto­summary
Router1(config­router)#exit
Also, Implementation plan is not complete without a time line.
WWTC Implementation plan
Now, I will discuss some guidelines to prepare WWTC implementation plan:
1. Follow the procedure outlined above.
2. Provide Configuration for each network device (except work stations)
3. Provider security configuration
4. Provide Active Directory Configuration
5. Provide Time Line
Except work station, configure all devices as per your network diagram and IP scheme. For example if you have
10 devices, you need to configure all devices accurately to get full credit.
Below are sample templates for your guidance of WWTC implementation plan.
Configuration Template Samples
Step 1: Connect Network Devices to the Network
The network infrastructure devices will be connected to the network. The installation engineer must ensure that
the devices are properly installed and powered from redundant power sources.
Step 2: Apply Device Configuration Template to Routers/Switches
The installation engineer will use the following configuration template to configure all core, distribution, and
access layer devices.
Switch> enable
Switch# configure terminal
Switch(config)# hostname
device­name(config)# ip domain­name xumuc.com
device­name(config)# enable secret
device­name(config)# username secret
device­name(config)# crypto key generate rsa
How many bits in the modulus [512]: 2048
device­name(config)# line con 0
device­name(config­line)# login local
device­name(config­line)# exit
device­name(config)# line vty 0 4
device­name(config­line)# login local
device­name(config­line)# transport input ssh
device­name(config­line)# exec­timeout 1 00
device­name(config­line)# exit
device­name(config)# line vty 5 15
device­name(config­line)# login
device­name(config­line)# exit
device­name(config)# no logging console
device­name(config)# no ip domain­lookup
Configure VLANs, Network, Routing protocols. Do not forget to configure voice vlan/s and wireless network.
Configure DHCP.
Security Implementation Tasks
VLAN, Port security, DHCP snooping, Authentication, ACL, firewall etc. (if required)
Active Directory Implementation Tasks
The tasks listed in Table 8 are necessary to successfully create the new WWTC.com Active Directory forest for
WWTC.
STEP
TASK
1
Create forest root domain
2
Create domain trees
3
Configure DNS stub zones for domains
4
Configure DNS suffix search list and distribute through GPOs
5
Establish forest trust with WWTC if required
6
Configure global catalog servers and FSMO roles
7
Create sites and subnets
8
Create site link objects and configure site link settings
9
Create organizational units and groups
Table 8: Active Directory Implementation Tasks
Step 1: Create Forest Root Domain
The installation engineer will create the WWTC.com forest root domain using the procedure below.
1. Click on the Roles node in Server Manager and click Add Roles under Roles Summary.
2. Select Active Directory Domain Services from the available server roles and click Next.
3. Confirm the selections and click Install.
4.
5.
6. And so on to final step
Step 2: Create Domain Trees
Use the same procedure described in Step 1
Step 3: Configure DNS Stub Zones(if required)
Project Schedule or Time line
DATE
COMPLETED PROJECT MILESTONE
March 27
Business and design requirements identified for network, security, and Active
Directory implementation.
April 3
Preliminary network design submitted for client review.
April 10
Network design modification requests received from client.
April 17
Preliminary security design submitted for client review.
April 24
Security design modification requests received from client.
April 28
Preliminary Active Directory design submitted for client review.
May 5
Active Directory design modification requests received from client.
May 12
Final designs (network, security, Active Directory) submitted to client.
Suggestion to prepare the Plan.
1. Prepare or revised your network high level diagram to indicate all networking devices, VLANs, link
addresses. You have done in your LAN submittal, please revise that diagram.
2. Prepare an equipment list which you are using in your network. Your equipment list should have name of
the equipment, connection to other equipment and IP addresses. You have done it in your LAN submittal
but review that list and revise it.
3. Divide the work as you seem appropriate such as VLANs, or equipment. For example if you have created
20 VLANs, then 5 VLANs each member or you have 20 equipment, 5 equipment each.
You do not have to follow, you can use your own methods. This submittal depends on clarity of your diagrams
and equipment list and IP address assignment.
Criteria
Project Contact List
Lan Implementation
task
Security
Implementation task
AD Implementation
task
Con?guration Routers
Level 3
Level 2
Level 1
Level 0
5 points
4 points
3 points
0 points
Completed the task as
per instruction without
any error.
Demonstrated creative
skill
Completed the task as
per instruction.
Completed the task but
not followed the
instruction
No submission
10 points
8 points
5 points
0 points
Prepared complete list
in sequence without
any error
Prepared list in
sequence with few
errors
Prepare list of task but
not in any sequence
No submission
10 points
8 points
5 points
0 points
Prepared complete list
in sequence without
any error
Prepared list in
sequence with few
errors
Prepare list of task but
not in any sequence
No submission
10 points
8 points
5 points
0 points
Prepared complete list
in sequence without
any error
Prepared list in
sequence with few
errors
Prepared list of task but
not in any sequence
No submission
5 points
4 points
3 points
0 points
Attempted but not
completed the task.
No submission
3 points
0 points
Attempted but not
completed.
No submission
3 points
0 points
Attempted but not
completed
No submission
3 points
0 points
Attempted but not
completed
No submission
Completed assignment 80% completed, missed
as per instructions. 2 or few name of devices,
3 errors in con?grations
interfaces, error in
con?guration data
Switches
5 points
4 points
Completed assignment 80% completed, missed
as per instructions. 2 or few names of devices,
3 errors in con?grations
interfaces, error in
con?guration data
VLAN Con?gurations
5 points
4 points
Completed assignment 80% completed, missed
as per instructions. 2 or
few name of VLANs,
3 errors in con?grations
interfaces, error in
con?guration
Voice VLAN and
Wireless
5 points
4 points
Completed assignment 80% completed, missed
as per instructions. 2 or
few name of VLANs,
3 errors in con?grations
interfaces, error in
con?guration
Security Technologies
DHCP and DNS
10 points
8 points
5 points
0 points
Completed as per
instruction. Applied
security with
con?guration and
explained role of the
devices in mitigation.
80% completed. Unable
to explain the role of
devices. Incomplete
con?guration
Attempted but not
completed.Wrong
devices wrong
con?gurations.
No submission
5 points
4 points
3 points
0 points
Demonstrated and
Demonstrated
Stated DHCP and DNS
applied DHCP and DNS
understanding of
in narrative.
technologoires with
application of DHCP
con?gurations and
and DNS
data.
technologies.Attempted
con?guration
AD Policies
AD Forest Domain OU
formation
AD Group Formation
10 points
8 points
5 points
0 points
Completes all AD
policies according to
criteria speci?ed and
provides supporting
details.
Completed all policies
and meet business
needs. But in some
policies did not follow
all the instructions
Partially completes
assignment; however
policies do not meet
business need
No submission
5 points
4 points
3 points
0 points
Created forest, domain, Created forest, domain, Stated only without any
and OU using
and OU with few errors
application
con?gurations and data
and supported with
diagram
5 points
4 points
3 points
Created groups using Created group with few Created group but did
con?gurations and data
errors
not demonstrate ability
and supported with
to apply technology
diagram. Demonstrated
expertise using script.
AD GPO
Implementation
Project Time Line
5 points
4 points
3 points
Created GPO and
Created GPO and
Created GPO and
implemented using
implemented with few implemented them but
con?gurations and data
errors
did not demonstrate
and supported with
ability to apply
diagram. Demonstrated
technology
expertise using script.
5 points
Prepared as per
instruction
Overall Score
No submission
Level 3
4 points
3 points
Prepared with on error Prepared but with many
errors
Level 2
Level 1
No submission
0 points
No submission
0 points
No submission
0 points
No submission
44 or more
29 or more
0 or more

Purchase answer to see full
attachment

Order a unique copy of this paper
(550 words)

Approximate price: $22

Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency

Order your essay today and save 15% with the discount code ESSAYHELP